Crowley Elementary School #17
Owner: Crowley I.S.D.
Scope of Work:
- Create a 3D BIM model with rebar
- Produce shop drawings for Piers
- Create rebar schedules and dashboards
Estimated Total Tons of Rebar: 64.975
Total Number of Piers: 242
Aubrey High School
Owner: Aubrey I.S.D.
Scope of Work:
- Create a 3D BIM model with rebar
- Produce shop drawings for Piers
- Create rebar schedules and dashboards
Estimated Total Tons of Rebar: 246.403
Total Number of Piers: 383
Victor Hexter Elementary School
Owner: Dallas I.S.D.
Scope of Work:
- Create 3D BIM models with rebar (for the Base Bid and the Alternate Bid)
- Produce shop drawings for Piers
- Create rebar schedules and dashboards
Estimated Total Tons of Rebar:
- Base Bid: 86.934
- Alternate Bid: 90.661
Total Number of Piers:
- Base Bid: 285
- Alternate Bid: 298